Again! AYKON is the first in its sector. Turkey`s unique cable-stayed vehicle bridge construction contract is signed and AYKON started statical calculations process of which all of the project, fabrication and erection stages are in its scope.
All type of two vehicle passage will be permitted across the bridge which will be designed according to Code KGM H30-S24 (AASHTO HS20-44)